Sikkim Electricity Bill Calculator:
Enter the kWh consumption and kW connected load recorded then press the calculate button to get the Sikkim Electricity Bill Online.
Sikkim electricity bill calculator, per unit rate and tariff order 2022-2023
Let we see the how the electricity tariff order is setup in the Sikkim state by the government of Sikkim. The power sector has tremendous growth to achieve the reaching electricity for every corners of the remoted areas and also the mountainous terrain. These significant growth of the electricity through the different types of projects such as wind, solar and hydro electric projects. It is one of major source for the development of economic in the state.
Low tension (LT) Per Unit Rate
Fixed Charges | ||||
Power Range | Per unit(₹) | Single Phase | Three Phase | |
Domestic – Single Phase | 0-50 | 1 | 50 | 200 |
51-100 | 2 | |||
101-200 | 3 | |||
201-400 | 3.5 | |||
above 401 | 4 | |||
Domestic – Three Phase | 0-50 | 3 | 200 | 500 |
51-100 | 4 | |||
101-200 | 5 | |||
201-400 | 6 | |||
above 401 | 6.3 | |||
Lt Industrial -Rural | 0-500 | 3.6 | 500 | 500 |
501-1000 | 4.4 | |||
1001 above | 5.8 | |||
Lt Industrial -Urban | 0-500 | 5.3 | 500 | 500 |
501-1000 | 6.2 | |||
1001 above | 7.15 |
Domestic
Single phase
The power has been consumed from 0-50 units , its cost is Rs.1 per unit. For 51 to 100 units consumed, the cost is Rs.2 per unit. For 101-200 units consumed, the cost will Rs.3 per unit. For 201-400 units consumed, the cost is Rs.3.5 per unit. For above 400 units consumed, the cost is Rs.4 per unit. There is a fixed charge for the above units is Rs.50 per month.
Three phase
The power has been consumed from 0-50 units , its cost is Rs.1 per unit. For 51 to 100 units consumed, the cost is Rs.2 per unit. For 101-200 units consumed, the cost will Rs.3 per unit. For 201-400 units consumed, the cost is Rs.3.5 per unit. For above 400 units consumed, the cost is Rs.4 per unit. There is a fixed charge for the above units is Rs.200 per month.
Commercial
Single phase
If the power has been consumed from 0-50 units , its cost is Rs.3 per unit. For 51 to 100 units consumed, the cost is Rs.4 per unit. For 101-200 units consumed, the cost will Rs.5 per unit. For 201-400 units consumed, the cost is Rs.6 per unit. For above 400 units consumed, the cost is Rs.6.3 per unit. There is a fixed charge for the above units is Rs.200 per month.
Three phase
If the power has been consumed from 0-50 units , its cost is Rs.3 per unit. For 51 to 100 units consumed, the cost is Rs.4 per unit. For 101-200 units consumed, the cost will Rs.5 per unit. For 201-400 units consumed, the cost is Rs.6 per unit. For above 400 units consumed, the cost is Rs.6.3 per unit. There is a fixed charge for the above units is Rs.500 per month.
Industrial- rural
In rural areas the power has supplied to the industry from 0-500 units , its cost is Rs.3.6 per unit. For 501 to 1000 units consumed, the cost is Rs.4.4 per unit. For above 1001 units consumed, the cost is Rs.5.8 per unit. There is a fixed charge for both the single phase and three phase is Rs.500 per month.
Industrial- urban
In urban areas the power has been supplied to the industry from 0-500 units , its cost is Rs.5.3 per unit. For 501 to 1000 units consumed, the cost is Rs.6.2 per unit. For above 1001 units consumed, the cost is Rs.7.15 per unit. There is a fixed charge for both the single phase and three phase is Rs.500 per month.