Mseb Electricity Bill Calculator, Per Unit Rate 2022-23

Mseb electricity Bill Calculator & Mahavitaran Calculator:

Enter the united consumption and press the calculate button to get the electricity bill value.


Choose Connection type:  
Total Unit Consumption: kWh
SELECT PHASE: Phase 1
Phase 3
 
 
 
Energy Charges INR
Fixed Charges INR
Total Bill INR

Mahadiscom has reduced their electricity tariff order by 4% and they all the tariff rates are determined since 2020 for the next five years. As per the latest tariff order the consumer category is divided by 7 number such as HT – Commercial, LT – Non-Residential or Commercial, LT – Residential, LT – Non-Residential or Commercial, LT – Residential, LT – Residential and LT-Industry.

But it is created in the new MSEB electricity tariff order 2022-23, previously it is called as HT VIII(B) – Temporary Supply (others), LT V – Advertisement and Hoardings, LT VII – Temporary Supply (Religious), LT VII – Temporary Supply (Others), LT VIII – Crematoriums and Burial Grounds, HT VIII (A) HT – Temporary Supply Religious, LT-V(A) – Power Loom and LT-V(B) – Industry (General).

Now let us see the electricity per unit rate as per Mahadiscom and Mseb or Mahavitran etc.

LT Residential Tariff:

It contains different slaps such as 0-100 units such as ₹ 3.36 per unit, for next 200 units which range from 101 300 units is ₹ 7.34/-, and the 301 – 500 units will be ₹ 10.37 and the above 500 units, the consumption will be ₹ 11.86/- Also, the consumer shall pay fixed charges of ₹ 105 per connection for single phase and the ₹ 350/- for three phase to be paid.

And the consumer, who is under BPL category, will be charged ₹1.16 per units for all the consumption. And the fixed charges will be ₹28 for the BPL consumer.

Consumption Slab Range Fixed/Demand Charges (Rs. /Month) Energy Charges (Rs. /kWh)
BPL Category  All the units 28 1.16
LT residential 0-100 units 105 350 3.36
101 300 units 7.34
301 500 units 10.37
Above 500 Units (Balance Units) 11.86

 

Wheeling and Fuel Allocation charges:

Also, the mseb charges 1.35 per unit as Wheeling charges and 1.61 as Fuel allocation charges in addition to their electricity bill.

LT II: LT Non-Residential or Commercial:

Lt Consumer shall pay their electricity bill based on the connected load i.e LT consumer shall pay 0 to 20 kW 7.07 and the for the connected load consumer of 20kW to 50kW, they shall pay 10.79 per units for more than 50kW the consumer shall pay 12.76 as per unit costs. Along with that consumer shall pay 427 per kW for connected loads.

LT II: LT Non-Residential or Commercial 0-20kW 427 per kW 7.07
20kW to 50kW 10.79
>50kW 12.76

 

LT III: LT-Public Water Works (PWW) and Sewage Treatment Plants:

LT III: LT-Public Water Works (PWW) and Sewage Treatment Plants 0-20kW 106 per kW 2.48
20kW to 40kW 129 per kW 3.84
>40kW 160 per kW 5.09

 

LT Agriculture:

 

LT IV: Agriculture – Unmeterd 0-3.7 kW 412 per kW
LT IV: Agriculture – meterd All Units 56 Per kW 1.95
LT IV – LT Agriculture Business All Units 117 per kW 3.29

 

LT Industry:

LT V: LT- Industry  0-20 kW 482 Per KW 5.11
Above 20 kW 321 Per kW 6.05

 

LT Street Light:

 

LT VI: LT Street Light – Local All Units 117 per kW 5.1
LT VI: LT Street Light – Corporation All Units 117 per kW 6.21

 

LT VII: LT – Public Services Government Educational Institutions and Hospitals:

 

LT VII: LT – Public Services Government Educational Institutions and Hospitals 0-20kW 353 Only 3.18
20kW to 50kW 353 Per kW 4.57
>50kW 353 Per kW 5.73

 

LT VII (B): LT – Public Services – School and collages

LT VII (B): LT – Public Services – School and collages 0-20kW 384 Only 4.57
20kW to 50kW 384 Per kW 7.23
>50kW 384 Per kW 7.49

 

LT VIII: LT Electric Vehicle:

LT VIII: LT Electric Vehicle All Units 56 Per kW 4.15

 

MSEB Electricity Tariff Order:

1Ph 3Ph
Consumption Slab Range Fixed/Demand Charges (Rs. /Month)
BPL Category  All the units 28
LT residential 0-100 units 105 350
101 300 units
301 500 units
Above 500 Units (Balance Units)
LT II: LT Non-Residential or Commercial 0-20kW 427 per kW
20kW to 50kW
>50kW
LT III: LT-Public Water Works (PWW) and Sewage Treatment Plants 0-20kW 106 per kW
20kW to 40kW 129 per kW
>40kW 160 per kW
LT IV: Agriculture – Unmeterd 0-3.7 kW 412 per kW
LT IV: Agriculture – meterd All Units 56 Per kW
LT IV – LT Agriculture Business All Units 117 per kW
LT V: LT- Industry  0-20 kW 482
Above 20 kW 321 Per kW
LT VI: LT Street Light – Local All Units 117 per kW
LT VI: LT Street Light – Corporation All Units 117 per kW
LT VII: LT – Public Services Government Educational Institutions and Hospitals 0-20kW 353 Only
20kW to 50kW 353 Per kW
>50kW 353 Per kW
LT VII (B): LT – Public Services – School and collages 0-20kW 384 Only
20kW to 50kW 384 Per kW
>50kW 384 Per kW
LT VIII: LT Electric Vehicle All Units 56 Per kW

Example for MESB Electricity Bill Calculation for 697 units:

Example – Single Phase – One Month – 697
Range Electricity Per unit Unit Consumption Bill amount
0-100 3.36 100 336
101-300 7.34 200 1468
301 to 500 10.37 200 2074
>500 11.86 197 2336.42
Energy Charges 6214.42
WC 940.95
FAC 1122.17
Duty 0
Fixed Cost 105
TAX 1341.2064
Total 9723.7464

 

https://www.mahadiscom.in/consumer/wp-content/uploads/2020/04/Commercial_Circular_for_MYT_Order-3.pdf

 