Apspdcl Bill Calculator, Per Unit Rate, Tariff Order 2022-23

Apspdcl Electricity Bill Calculator:

Just enter the per unit consumption in the first column and press the calculate button to get the electricity bill as per the latest tariff order from Apspdcl.


Choose Connection type:  
Total Unit Consumption: kWh
 
 
Energy Charges INR
Fixed Charges INR
Total Bill INR

 

APERC Electricity Bill Calculator:

Andra Pradesh is another most popular state in India and their electricity tariff rate will be less as compared with the other south Indian state. Andra Pradesh electricity board is controlled by APERC and apspdcl. Both are under state government. They have an installed capacity of 27124 MW power capacities against the power requirement of 12,293 MW. Also per day in Andra Pradesh is required around 203 Million units for all sectors.

Here you can see the total power requirement and installed capacity in MW by individual resources.

1 Thermal power 13,890
2 Gas fuel-based 7,217
3 Hydroelectric 1820.6
4 Solar 4,116.01
5 Wind power 80
Total 27,124

 

However in this article we can see how to calculate the electricity bill of your energy consumption based on the apspdcl latest tariff announced @ 2023.

Apspdcl Tariff Order and Per unit Rate:

Here apspdcl is splitted their tariff order by several category such as,

  • LT Cat-I : Domestic (Telescopic)
  • LT Cat-II : Commercial & Others
  • LT Cat-III: LT Industry
  • LT Cat-IV: LT Institutional
  • LT Cat-V : Agricultural & Related
  • HT Cat-(A): Domestic
  • LT Cat-V : Agricultural & Related
  • HT Function Halls/Auditoriums
  • HT Cat-III : Industry Peak (06-10 ) & (18-22)
  • HT Industrial colonies

Andrapradesh electricity per unit rate for domestic consumer:

Domestic consumers are the residential, household,  small shops etc. They have to pay their electricity bill as per the below table.

This they shall pay ₹1.9 of their first 30 units, for next 45 units they shall pay ₹ 3 per unit and the next 4.5 for the next 50 units and the 6 for the next 100 units, 8.75 for the next 175 units and the 9.75 for the all the above units of 400 and they shall pay in slap basis. Along with that, the consumer shall pay the applicable fixed charges of 10 per connection per month.

 

Category Range Per Unit Fixed Charges
LT Cat-I : Domestic (Telescopic) 0-30 1.9 10
31-75 3 10
76-125 4.5 10
126-225 6 10
226-400 8.75 10
>400 9.75 10

 

Apspdcl Commercial Tariff 2022:

Apspdcl allow the small commercial consumer who have advertising board, small market, shops, welding boards etc to follow the below mentioned commercial tariff and the good thing is that here you shall pay under telescope tariff (slap basis).

Category Range Per Unit Fixed Charges
LT Cat-II : Commercial & Others 0-50 5.4 75
51-100 7.65 75
101-300 9.05 75
301-500 9.6 75
Above 500 10.15 75

 

As per tariff order consumer shall pay 5.4 for their 50 units and the 7.65 for their next 50 units, 9.05 for the next 100 units and followed by the unit range of next 200 for 9.6 INR and the 10.15 for the consumption above 500 units.

In addition to that the consumer shall pat 75 per month per connection as fixed charges. Also all the consumer shall pay applicable taxes during billing.

Also for some of your application has different tariff under the commercial scheme and they are not come into telescopic tariff and they are,

Category Range Per Unit Fixed Charges
(i) Advertising Hoardings All Units 12.25 100
(ii) Function Halls/Auditorium s All Units 12.25 0
(B): Start up power All Units 12.25 0
(C) : Electric Vehicles (Evs) / Charging stations All Units 6.7 0
(D) : Green Power All Units 12.25 0

 

Mostly all shall pay 12.25 for one unit consumption and the 100 as fixed charges.

LT industry tariff & Per Unit Rate:

Industrial consumer shall pay fixed charges and the per unit charges in fixed format such as (A): Industry (General) for All Units they shall pay ₹ 6.7, Rice Mills & Pulverizing Mills (101 HP to 150 HP) for All Units shall pay ₹ 6.7 per units, (B): Seasonal Industries (off season) for All Units shall pay ₹ 7.45 and for (D): Cottage Industries upto 10HP for All Units shall pay ₹ 3.75 per units.

Category Range Per Unit Fixed Charges
(A): Industry (General) All Units 6.7 75
Rice Mills & Pulverizing Mills (101 HP to 150 HP) All Units 6.7 275
(B): Seasonal Industries (off season) All Units 7.45 75
(D): Cottage Industries upto 10HP All Units 3.75 20

 

LT Institutional Tariff Rate:

Institutional consumer shall pay ₹ 7 per unit along with that they have to pay ₹ 75 as fixed charges per month and look at the below tariff rate,

Category Range Per Unit Fixed Charges
(A):  Institutional Utilities All Units 7 75
(B):Institutional General Purpose All Units 7 75
(C): Institutional Religious Places All Units 5 30

 

LT Agriculture Tariff Rate:

Agriculture (self-forming) consumer shall pay ₹2.5 per units and the corporational consumer shall pay 3.5 per units.

Category Range Per Unit Fixed Charges
(i) Corporate Farmers & IT Assesses All Units 3.5 0
(ii) Non-Corporate Farmers All Units 0 0
(iii) Salt farming units with Connected Load upto 15HP All Units 2.5 0
(iv) Sugarcane crushing All Units 0 0
(v) Rural Horticulture Nurseries All Units 0 0
(vi) Floriculture in Green House All Units 4.5 75
(B): Aquaculture and Animal Husbandry All Units 3.85 30
(D): Agro Based Cottage Industries upto 10HP All Units 3.75 30
Government/Priv ate Lift Irrigation Schemes All Units 6.4 0

 

HT Tariff Rate:

The Fourth column mentions the fixed charges

HT Cat-(A): Domestic
(B): Townships, Colonies, Gated Communities and Villas      
11 kV All Units 7 75
33 kV All Units 7 75
132 kV All Units 7 75
220 kV All Units 7 75

 

HT Cat-II : Commercial & Others
11 kV All Units 7.65 475
33 kV All Units 6.95 475
132 kV All Units 6.7 475
220 kV All Units 6.65 475

 

HT Function Halls/Auditoriu ms
11 kV All Units 12.25 0
33 kV All Units 12.25 0
132 kV All Units 12.25 0
220 kV All Units 12.25 0

 

(B): Start up power
11 kV All Units 12.25  
33 kV All Units 12.25  
132 kV All Units 12.25  
220kV All Units 12.25  

 

C): Electric Vehicles (Evs) / Charging stations
11 kV All Units 6.7  
33 kV All Units 6.7  
132 kV All Units 6.7  
220 kV All Units 6.7  

 

Green Power
11 kV All Units 12.25  
33 kV All Units 12.25  
132 kV All Units 12.25  
220 kV All Units 12.25  

 

HT Cat-III : Industry Peak (06-10 ) & (18-22)
11KV All Units 7.8 475
33KV All Units 7.35 475
132KV All Units 6.9 475
220 kV All Units 6.85 475

 

Off-Peak (10 -15)
& (00-06)
11KV All Units 5.55 475
33KV All Units 5.1 475
132KV All Units 4.65 475
220 kV All Units 4.6 475

 

Normal (15-18) &
(22-24)
11KV All Units 6.3 475
33KV All Units 5.85 475
132KV All Units 5.4 475
220 kV All Units 5.35 475

 

Industry, ToD (LGD) (Jun’22-
Aug’22 ) & (Nov’22-Jan’23)
11KV All Units 7.3 475
33KV All Units 6.85 475
132KV All Units 6.4 475
220 kV All Units 6.35 475

 

Off-Peak (10 -15)
& (00-06)
11KV All Units 5.55 475
33KV All Units 5.1 475
132KV All Units 4.65 475
220 kV All Units 4.6 475

 

Normal (15-18) &
(22-24)
11KV All Units 6.3 475
33KV All Units 5.85 475
132KV All Units 5.4 475
220 kV All Units 5.35 475

 

Industrial colonies
11KV All Units 7 0
33KV All Units 7 0
132KV All Units 7 0
220 kV All Units 7 0

 

Andra Pradesh Electricity Bill Calculation:

Let us consider a consumer consumed 500 units in a month with the connected load of 2kW and calculate the electricity bill as per the apspdcl latest tariff order 2022-23.

Example – Single Phase – One Month -500 – 2kW Connected Load
Range Electricity Per unit Unit Consumption Bill amount
0-30 1.9 30 57
31-75 3 45 135
76-125 4.5 50 225
126-225 6 100 600
226-400 8.75 175 1531.25
>400 9.75 100 975
  Energy Charges 3523.25
Fixed Cost 10
Total 3533.25
See also  GOA Electricity Bill Calculator, Per Unit Rate 2022-23

Leave a Comment